Our Process
Our Location & Facility Expansion
Pan Pacific Products is located in Broken Bow, OK. The plant was moved from its original site east of Broken Bow, to its new location, where it now sits on a 62 acre plot of land located one mile west of Broken Bow. The construction included tremendous modification and upgrades.
1. Raw Material Handling and Refining Process
Trucks bring in green pine chips and dumps the raw material into a conveyor system. The conveyor system transports the chips to storage area. The chip storage area accommodates delivery of 1,000 tons of green chips per day. The chips are then discharged from the center of the pile onto an incline belt conveyor, pass through a magnet, and then go to a chip washing system that removes foreign materials. Washed chips are then pumped to the refining system.
Incoming chips from the chip wash are separated from process waters before they enter the refining process. The pressurized refiner exposes the chips to steam softening the lignin in the chips. The softened chips are then passed through the refiner that separates the chips into individual fibers. Resin and wax are added at this point before material is pneumatically relayed to the dryer.
2. Dryer Process
3. Forming and Pressing Process
4. Sanding Process
5. Sawing Process